ipolog Help Center
ipolog Portal & Common Data
  • general information
    • Lizenzmanagement im ipolog Portal
    • Registration of new users in the ipolog portal
    • System requirements ipolog
  • Overview
    • v3 project structure overview
  • (ipolog) project
    • Favorite projects
  • Scenarios
    • Scenario view
    • Creating a scenario
    • Using Part Data in your scenario
    • Synchronizing updates from common data to your scenario
    • Migrating v2 scenarios into the v3 project structure
  • Planning Spaces
    • Creating a new Planning Space
    • Compare planning spaces
    • Ruleset for planning states
    • Synchronizing updates in the common data planning state to your planning spaces
    • Synchronize common data updates from the planning space to other planning spaces in the same scenario
    • Locking and unlocking planning spaces
    • Deleting a planning space
  • Common Data - Racks
    • Common Data - Overview
    • Working within a Rack Planning State
    • Use newly created or updated shelves in a scenario
    • Create and publish racks in Rack Editor
  • Common Data - Boxes
    • Common Data - Overview
    • Working within a box planning state
    • Create and publish boxes in the Box Editor
    • Use newly created or updated boxes in a scenario
    • Import multiple boxes without geometry
  • Common Data - Part Data
    • What is Part Data? (Example dataset)
    • Managing part data planning states
    • Importing Part Data
    • Managing a part data planning state - Creating, editing and deleting parts
    • Checking the scenario part data
    • Managing a part data planning state - Overview
  • Background knowledge regarding the v3 structure
    • Material placement by material area and station assignment
ipolog 4 Workspace
  • overview
    • ipolog 4 Workspace: Module Bar
    • ipolog 4 Workspace: Navigation
    • ipolog 4 Workspace: Data checklist
  • Preliminary preparation for planning
    • ipolog 4 Workspace: File Menu
    • ipolog 4 Workspace: File Menu - Reports
    • ipolog 4 Workspace: File Menu - Labs
    • Scenario Admin
    • ipolog 4 Workspace: User Interface Catalog
    • Resources import via the Catalog
    • ipolog 4 Workspace: Editors in the catalog
    • Import Facilities
    • Logging
    • ipolog 4 Workspace: Layout Editor
    • Options
  • Material provisioning
    • ipolog 4 Workspace: Material Zone Editor - Box Demand Dialog
    • Rack Instance Editor
    • ipolog 4 Workspace: Material Provision Planning
    • ipolog 4 Workspace: Material-Zone Editor
    • Material Provisioning Editor
    • ipolog 4 Workspace: Rack Planogram
  • Processplanning
    • Change Process Sequence
    • TagList Editor
    • User Interface Worker Gantt
    • Werker simulation
    • Conveyor Editor
    • Worker simulation - tool pick-up
    • Production Program
    • ipolog 4 Workspace - Production Program - Example
    • Animation Control
    • Production Flow View
    • Filter Set
    • ipolog 4 Workspace: Assembly Process Editor
    • Process Modeling in Excel
    • ipolog 4 Workspace: Specifications of the Workspace Excel
  • Optimization
    • Reporting
    • Selection Display
    • Colorizer
  • Exchange with ipolog 4 Material Flow
    • ipolog 4 Workspace: Export of the layout for Material Flow
    • Export provision requirements from ipolog 4 Workspace
  • ipolog Factory Viewer
    • ipolog 4 Workspace: Installation and linking your project to ipolog Factory Viewer
    • ipolog Factory Viewer: Settings in Workspace
  • Plugins
    • ipolog 4 Workspace: ipo Omniverse Connector
    • CAD Import
    • Import Layout from MicroStation to Workspace
    • Import of environmental data from MicroStation
    • ipolog 4 Workspace: .dwg-Import with Xdata (AutoCAD)
  • ipolog 4 Workspace Background information
    • Worker analysis tool - Time Distance Diagram
    • Worker Routes
    • OC - Outside Corner Area
    • Worker analysis tool Reporting user interface
    • Calculation of provisioning requirements in ipolog 4 Workspace
    • ipolog 4 Workspace: Background information regarding the assembly Excel
    • Structure of Provision Requirements - Import File
  • Troubleshooting
    • ipolog 4 Workspace: Graphics error in 3D view
    • ipolog 4 Workspace: Missing racks in the catalog
    • Display error in assembly planning (catalog, layout editor)
ipolog 4 Material Flow
  • Overview: Planning with ipolog 4 Material Flow
    • Example data ipolog 4 Material Flow (german)
    • Menu bar
    • data check sheet for ipolog 4 Material Flow
    • Navigation 2D and 3D view
    • Undo / Redo - Function
  • Preparation for planning
    • ipolog 4 Material Flow: Übersicht Projektkonfiguration
    • Importing and Editing Resources
    • Create time elements - Import file
    • Import time elements
    • Create process elements - Import file
    • Create, import and edit process elements
    • Creating shift plan - import file
    • Importing shift plans
    • ipolog 4 Material Flow: Logistics Quantity Framework
    • Importing the Logistics Quantity Framework
    • Export Logistics Quantity Framework
    • Import of material areas for several stages
    • Create or Import provision requirements
    • Import of consumptions
  • Layout planning
    • Layout Editor
    • Create transport network
    • ipolog 4 Material Flow: Creating and defining routes
    • Generate routes
  • Material Flow Planning
    • Visualisation of the container in 3D
    • ipolog 4 Material Flow: Default Process Chain/ Standard supply chain
    • Default grouping chains
    • Default disposal chain
    • Create decision tree
    • Import decision tree
    • Export decision tree
    • Grouping Chain Editor
    • Supply Chain Editor
    • Supply Chain Editor - Grouping Chains
    • Default Values for Initial, Reorder and Safety Levels
    • Bundler chain modeling
  • Transport Planning
    • Means of transport calculation preview
    • Trailer planning
    • Transport simulation
    • Waypoint Analysis
    • Report Transportsimulation
    • Simulation parameters
    • Export Transport Orders
    • Export tours
    • Creating Groups for direct transport in ipolog Material Flow
  • Analytics
    • Evaluation of manpower requirements
    • Cost Evaluation
    • Area Utilization
    • Dock capacity utilization
    • Dynamic utilization
    • Sankey
    • Area and volume report
    • KPI-Monitor
  • ipolog Factory Viewer
    • Installation & Verknüpfung mit ipolog Factory Viewer
    • ipolog Factory Viewer: Einstellungen in Material Flow
  • ipolog 4 Material Flow background knowledge
    • ipolog 4 Material Flow: Kostenauswertung pro Teil - Berechnungsbeispiel
    • ipolog 4 Material Flow: Kostenauswertung pro Produkt - Berechnungsbeispiel
    • ipolog 4 Material Flow: Kostenauswertung pro Produkt
    • ipolog 4 Material Flow: Von der JT-Datei zum Ressourcenimport (Anhänger)
    • Feinberechnung -Zuordnung zu Berechnungsintervall
    • ipolog 4 Material Flow: Zeitbausteine importieren - Korrekte Formatierung
    • Erzeugung Dummy Bereitstellanforderungen aus dem Logistischen Mengengerüst
    • Area and volume report
    • Calculation of dummy provision requirements
    • Calculation of empties transport orders
    • Calculation of full / empty swaps in transport and materialflow planning
    • Calculation of manpower requirements
    • Calculation of path length / path selection
    • Calculation of time utilization of transport types and transport instances
    • Capacity calculation for trailers (option 2 trailer planning)
    • Explanation of simulation parameters for transport calculation
    • Fixed cycle tugger train
    • Functioning of algorithm for the automatic route generation
    • Investment costs/ Resource Requirements
    • Order and transport calculation
    • Provision Requirements - Backgroundinformation
    • Temporal Utilization of Transporttype and -instanc
    • Tour Calculation
    • Trailer capacity (option 1 trailer planning)
    • What does boxmatrix mean?
  • Troubleshooting
    • Freeze in supply chain editor
    • No import of process elements
    • Transfer load carriers & load units from an LQF file to resource management
    • Transport calculation error message "No worker assigned".
    • Path restrictions are no longer saved after restart
    • Graphic error / font very large after opening ipolog Material Flow
    • Graphics problems / Text is not displayed properly in the user interface
    • Invalid Supply Chains
    • Create transport network not possible
    • Way restriction cannot be saved
    • ipolo 4 Material Flow: Order and transport calculation (possible errors)
    • Route cannot be saved
    • Resources cannot be imported
    • Errors when importing LQF
  • Help tools
    • Convert JT to IV
    • LQF Mapper - Help tool for creating Logistics Quantity Framework in ipolog format (LQF)
ipolog Factory Viewer
  • Overview
    • ipolog Factory Viewer: Installation and linking your project
    • ipolog Factory Viewer: Functions
    • ipolog Factory Viewer: Module Bar
    • ipolog Factory Viewer: Annotation Mode
    • ipolog Factory Viewer: Viewpoints
    • ipolog Factory Viewer: Navigation
    • ipolog Factory Viewer: Settings
    • ipolog Factory Viewer: Server Connection
    • ipolog Factory Viewer: View settings and Advanced Settings
    • ipolog Factory Viewer – Use with VR glasses
  • ipolog Factory Viewer Hintergrundwissen
    • ipolog Factory Viewer: Den Pfad für Factory Viewer in Material Flow und Workspace manuell definieren
    • ipolog Factory Viewer: FAQ
    • ipolog Factory Viewer: Behältervolumen Berechnung & Diagramm
Installation and first steps
  • Installation Guide
    • Installation and first steps
ipolog Planning Adventure
  • ipolog Planning Adventure - Vorbereitung
    • ipolog 4 Planning Adventure - 1. Planspiel Vorbereitung
    • ipolog 4 Planning Adventure - 2. Szenario erstellen
  • ipolog Planning Adventure - Material Flow
    • ipolog 4 Material Flow Planning Adventure - Ausgangssituation & Registrierung
    • ipolog 4 Material Flow Planning Adventure - Grundlegende Funktionen
    • ipolog 4 Material Flow Planning Adventure - 1. Programmstart
    • ipolog 4 Material Flow Planning Adventure - 2. Layoutplanung
    • ipolog 4 Material Flow Planning Adventure - 2.1 Layoutstruktur
    • ipolog 4 Material Flow Planning Adventure - 2.2 Wegenetz erstellen
    • ipolog 4 Material Flow Planning Adventure - 3. Materialflussplanung: Logistische Prozessplanung
    • ipolog 4 Material Flow Planning Adventure - 3.1 Standardversorgungskette anlegen
    • ipolog 4 Material Flow Planning Adventure - 3.2 Standardentsorgungsketten
    • ipolog 4 Material Flow Planning Adventure - 3.3 Teile zu SVKs zuweisen
    • ipolog 4 Material Flow Planning Adventure - 3. Materialflussplanung: Routen- und Detailplanung
    • ipolog 4 Material Flow Planning Adventure - 3.4 Routenplanung
    • ipolog 4 Material Flow Planning Adventure - 3.5 Bündler anlegen
    • ipolog 4 Material Flow Planning Adventure - 3.6 Prozessketteneditor
    • ipolog 4 Material Flow Planning Adventure - 4. Transportsimulation
    • ipolog 4 Material Flow Planning Adventure - 4.1 Analyse
    • ipolog 4 Material Flow Planning Adventure - 5. Optimierungen
    • ipolog 4 Material Flow Planning Adventure - 5.1 Optimierungen: Routenzugbahnhof
    • ipolog 4 Material Flow Planning Adventure - 5.2 Optimierungen: Routen
    • ipolog 4 Material Flow Planning Adventure - 5.3 Optimierungen: Direkttransport Gruppen
    • ipolog 4 Material Flow Planning Adventure - 5.4 Nicht erfüllbare Aufträge
    • ipolog 4 Material Flow Planning Adventure - 5.5 Szenarienvergleich im Portal
    • ipolog 4 Material Flow Planning Adventure - 6. Factory Viewer
    • ipolog 4 Material Flow Planning Adventure - Abschluss
  • ipolog Planning Adventure - Workspace
    • ipolog 4 Workspace Planning Adventure - Ausgangssituation
    • ipolog 4 Workspace Planning Adventure - Registrierung
    • ipolog 4 Workspace Planning Adventure - Grundlegende Funktionen
    • ipolog 4 Workspace Planning Adventure - Programmstart
    • ipolog 4 Workspace Planning Adventure - 1. Bereitstellungsplanung und Montageplanung
    • ipolog 4 Workspace Planning Adventure - 1.1 Montagelinie "Linie2x" anlegen
    • ipolog 4 Workspace Planning Adventure - 1.2 Feinplanung der Montagelinie
    • ipolog 4 Workspace Planning Adventure - 1.3 Anpassung der Bereitstellungsplanung
    • ipolog 4 Workspace Planning Adventure - 2.1 Prozessplanung
    • ipolog 4 Workspace Planning Adventure - 2.2 Workingpoint anlegen & Gantt updaten
    • ipolog 4 Workspace Planning Adventure - 2.3 Arbeitslast der Werker angleichen
    • ipolog 4 Workspace Planning Adventure - 3. Supermarktplanung
    • ipolog 4 Workspace Planning Adventure - 3.1 Supermarktplanung: Materialbereitstellung
    • ipolog 4 Workspace Planning Adventure - 3.1 Supermarktplanung: Materialbereitstellung 2
    • ipolog 4 Workspace Planning Adventure - 3.1 Supermarktplanung: Materialbereitstellung 3
    • ipolog 4 Workspace Planning Adventure - 4. Factory Viewer
    • ipolog 4 Workspace Planning Adventure - Abschluss
Admin Area
  • For admins
    • Information for Admins
    • Creating a project
    • Deleting a project
    • Account Settings
    • Add authorization to user groups
    • Add user groups to projects
    • Adding users to a user group
    • Create user group
    • Information about user claims
Troubleshooting
  • General
    • ipolog 4 Workspace oder ipolog 4 Material Flow zeigt mir an, dass ich eine alte Version verwende.
    • The ipolog software does not start
    • Support for software improvement
    • Deactivating the 3D scene for the entire project
    • Identify Proxy
    • Where can I see my current ipolog version?
    • Note
    • How to create a logfile?
    • No user interface after starting ipolog
Release Notes ipolog
  • Release Notes 2025
    • Release 4.7.0
    • Release 4.6.2
    • Release 4.6.1
    • Release 4.6.0
    • Release 4.5.2
  • Release Notes 2024
    • Release Notes 4.5.1
    • Release Notes 4.5.0
  • Release Notes 2023
    • Release Notes 4.4.7
    • Release Notes 4.4.6.3
    • Release Notes 4.4.6.2
    • Release Notes 4.4.6.1
    • Release Notes 4.4.6
    • 4.4.5 Release Notes
    • 4.4.4 Release Notes
  • ipolog Release Notes 2022
    • Release 4.4.2
    • 4.4.1 Release Notes
  • ipolog Release Notes 2021 ( Material Flow, Workspace, Portal )
    • 2021-11 Release Notes ipolog
    • 2021-09 Release Notes ipolog
    • 2021-05 Release Notes ipolog
    • 2021-03 Release Notes ipolog
    • 2021-02 Release Notes ipolog
  • Release Notes
    • 2020-12 Release ipolog 4 Workspace (EN)
    • 2020-11 Release ipolog 4 Workspace
    • 2020-10 Release ipolog 4 Workspace
    • 2020-08 Release ipolog 4 Workspace
    • 2020-07 Release ipolog 4 Workspace
    • 2020-06 Release ipolog 4 Workspace
  • Release Notes ipolog 4 Material Flow
    • 2020-12 Release ipolog 4 Material Flow (EN)
    • 2020-11 Release ipolog 4 Material Flow
    • 2020-10 Release ipolog 4 Material Flow
    • 2020-08 Release ipolog 4 Material Flow
    • 2020-07 Release ipolog 4 Material Flow
    • 2020-06 Release ipolog 4 Material Flow
ipolog Help Center
✉ Contact support
DE EN
Help Center › Troubleshooting › General › Note

Note

alert cookies ALT Hinweis

We use cookies, read more https://www.ipolog.ai/datenschutz/

Last updated: 2023-08-07

© OptWare GmbH · Legal Notice · Privacy