ipolog 4 Workspace: Data checklist

Erste Schritte Checkliste first steps check list Workspace

1. Layout data

  • Floor plan layout (.dwg/.dgn/.jsn)
  • Please note: .jsn layout files can only be created by exporting from ipolog
  • If available: 3D facilities (tables, office parts, etc.) in a corresponding 3D format (*.iv, *.obj, *.jt, *.wrl, *.ply, *.fbx) for further use in the scenario. More about this here: Facility Import.

2. Process data

  • Process number and designation
  • Duration
  • Workplace at which the process is carried out
  • Assignment to worker
  • Material required for the process
  • Assignment to the product for which the process must be executed.
  • 3D geometry of the products (.dwg/.dgn)

3. Material data

  • Part number and designation
  • Assignment to the material area on which the material is staged.
  • Assignment to the container in which the material is staged
  • Dimensions of the containers
  • 3D geometry of containers (.dwg/.dgn)
  • Assignment to shelf (if the material is in a shelf)
  • 3D geometry of shelves (.dwg/.dgn)

or

  • Shelf dimensions for configuration in IPO.Rack
  • Assignment to the product in which the material is used.

4. General information

  • Production programme
  • Cycle time